|

 Length: 6.586m
Construction period: 2006 - 2013
Construction costs: 218 Mio. € (new cosntruction 2. tube and restoration 1. tube)

 The tunnel Pfänder represents the bypass for the metropolitan area of Bregenz. As the northern part of the Rhine Valley highway A14 this section is part of the most important north-south connection in the area.
page 1 page 2 |